| Job_No | Project | Client | Project Manager | Contract Value ('000s) | Completion Date |
|---|
| 06-295 | LDS BRAESIDE | Kane Constructions Pty. Ltd. | Simon Cock | 41 | |
| 07-057 | Healesville RACV Country Club | Healesville Racv Country Club | Simon Cock | 1180 | 31/12/2009 |
| 07-057 | Healesville RACV Country Club | Abigroup Contractors Pty. Ltd. | Simon Cock | 1180 | 31/12/2009 |
| 07-151 | LEITH PARK RETIREMENT VILLAGE | Momentum Comercial Pty. Ltd. | Brendan Haynes | 278 | 15/02/2010 |
| 07-443 | Point Cook Community Centre | Abd Group Pty. Ltd. | Brendan Haynes | 742 | 28/05/2009 |
| 08-079 | Footscray Road Truck Facility | Loaram Constructions Pty. Ltd. | Brendan Haynes | 570 | 31/10/2008 |
| 08-084 | Lochmore Apartments | Abd Group Pty. Ltd. | Simon Cock | 606 | 30/06/2010 |
| 08-096 | Service Rd. Extension, Deer Park | Morabito Nominees Pty. Ltd. | Brendan Haynes | 149 | 25/03/2009 |
| 08-201 | Lincoln Park Landscaping | City of Moonee Valley | Simon Cock | 171 | 30/06/2009 |
| 08-260 | Stormwater extension - Trenerry | Built VIC Pty. Ltd. | Brendan Haynes | 144 | 23/04/2009 |
| 08-270 | Trench grate repair for Forest Hill Chase | Forest Hill Chase Shopping Centre | Simon Cock | 7 | 08/08/2008 |
| 08-303 | 4 Storey office & Carpark - Civil works | St Hilliers Contracting Pty. Ltd. | Graeme Savage | 225 | 24/09/2009 |
| 08-309 | City of Boroondara Camberwell Precinct Redevelopment | Abigroup Contractors Pty. Ltd. | Brendan Haynes | 546 | 10/12/2009 |
| 08-320 | Melbourne Airport Temporary Airside Road | John Holland Pty. Ltd. | Brendan Haynes | 334 | 11/11/2009 |
| 08-350 | Reservoir West Primary School | Ace Landscape Services Pty. Ltd. | Luke Jordin | 398 | 01/08/2011 |
| 08-350 | Reservoir West Primary School | Dura | Luke Jordin | 398 | 01/08/2011 |
| 08-350 | Reservoir West Primary School | Dura (Australia) Constructions Pty. Ltd. | Luke Jordin | 398 | 01/08/2011 |
| 08-350 | Reservoir West Primary School | Laser Electrical | Luke Jordin | 398 | 01/08/2011 |
| 08-360 | Waverley Gardens Shopping Centre- Site Cut | Mirvac Constructions (VIC) Pty. Ltd. | Grant Coulthard | 8 | 25/08/2008 |
| 08-366 | Pascoe Vale North Primary School | Allmore Constructions Pty. Ltd. | Brendan Haynes | 226 | 30/10/2009 |
| 08-402 | LDS - Epping Church | Kane Constructions Pty. Ltd. | Raid Misconi | 288 | 07/05/2010 |
| 08-427 | Dromana Seconday College - Order No 489-9304 | Dura (Australia) Constructions Pty. Ltd. | Brendan Haynes | 51 | 07/12/2009 |
| 08-438 | Kingston Centre - CPK Civil Works | Walton Construction Pty. Ltd. | Asoka Chandrawanka | 371 | |
| 08-440 | Wellington Secondary College - Only Building Earthworks G Gravel Carpark | Allmore Constructions Pty. Ltd. | Brendan Haynes | 98 | 30/11/2009 |
| 08-447 | Box Hill T.A.F.E AIM / NSCE | St Hilliers Contracting Pty. Ltd. | Simon Cock | 371 | 30/04/2010 |
| 08-449 | Janefield Road Reinstatment | CCB Envico | Simon Cock | 39 | 01/10/2008 |
| 08-452 | Northern Hospital - SSU Stage 2 | John Holland Pty. Ltd. | Luke Jordin | 166 | 25/05/2009 |
| 08-452 | Northern Hospital - SSU Stage 2 | Northern Health | Luke Jordin | 166 | 25/05/2009 |
| 08-455 | Highett Medical Centre | Kane Constructions Pty. Ltd. | Brendan Haynes | 0 | |
| 08-462 | Skilled Stadium | Kane Constructions Pty. Ltd. | Brendan Haynes | 0 | |
| 08-462 | Skilled Stadium | St Hilliers Contracting Pty. Ltd. | Brendan Haynes | 0 | |
| 08-463 | Kolbe Catholic College | Catholic Archdioces Of Melbourne | Asoka Chandrawanka | 1770 | 23/02/2009 |
| 08-466 | State Coronial Services Centre Redevelopment - Revised | Hansen Yuncken Pty. Ltd. | Grant Coulthard | 125 | |
| 08-472 | Roadwork and Carpark Construction- William Cooper Walk- Edgewater | Cardno Grogan Richards | Asoka Chandrawanka | 204 | 16/06/2009 |
| 08-473 | New Storage Shed for Guide Dogs Victoria | Whitefield Mcqueen Irwin Alsop | Asoka Chandrawanka | 75 | 02/03/2009 |
| 08-476 | Costco, Footscray | Walkers Plumbing | Brendan Haynes | 2679 | 09/09/2009 |
| 08-476 | Costco, Footscray | Costco Wholesale | Brendan Haynes | 2679 | 09/09/2009 |
| 08-476 | Costco, Footscray | Hansen Yuncken Pty. Ltd. | Brendan Haynes | 2679 | 09/09/2009 |
| 08-522 | Ascot Vale Church | Visual Builders Pty. Ltd. | Brendan Haynes | 29 | 09/12/2008 |
| 08-528 | Berwick Grammar School, Tivendale Rd Upgrade and Melbourne Water Main Drain. Contract No: 08ME0233 | Berwick Grammer School | Simon Cock | 368 | 01/05/2009 |
| 08-539 | Nintendo Carpark Extension | Perfection Private Hospitals Pty. Ltd. | Simon Cock | 88 | 31/12/2008 |
| 08-541 | Caroline Springs - Brookside Campus | Dura (Australia) Constructions Pty. Ltd. | Brendan Haynes | 31 | 26/11/2008 |
| 08-546 | Kooyong Lawn Tennis Club Refurbishment | Construction Engineering (Aust) Pty. Ltd. | Brendan Haynes | 348 | 30/04/2010 |
| 08-546 | Kooyong Lawn Tennis Club Refurbishment | Kooyong Lawn Tc | Brendan Haynes | 348 | 30/04/2010 |
| 08-547 | Roberts McCubbin Primary School | CICG Pty. Ltd. | Aleks Malesevic | 20 | 01/02/2009 |
| 08-555 | Gertrude Street Crossover | Liquid Lines Pty. Ltd. | Grant Coulthard | 9 | 05/12/2008 |
| 08-559 | Northern Hospital - Mental Health Development | Northern Health | Luke Jordin | 634 | 30/10/2010 |
| 08-559 | Northern Hospital - Mental Health Development | Northern Health C/O - John Holland Group | Luke Jordin | 634 | 30/10/2010 |
| 08-559 | Northern Hospital - Mental Health Development | Psg Elecraft | Luke Jordin | 634 | 30/10/2010 |
| 08-559 | Northern Hospital - Mental Health Development | H Troon Pty. Ltd. | Luke Jordin | 634 | 30/10/2010 |
| 08-561 | Jolimont Square | Folkestone Ltd | Graeme Savage | 5 | 18/12/2008 |
| 08-563 | TAFE - Automotive Centre of Excellence | Hansen Yuncken Pty. Ltd. | Grant Coulthard | 25 | 26/03/2009 |
| 08-564 | Berwick Select Entry School | Kane Constructions Pty. Ltd. | Simon Cock | 2227 | 31/10/2010 |
| 08-567 | Mcdonalds Sebastapol | Cardno Grogan Richards | Asoka Chandrawanka | 196 | 31/03/2009 |
| 08-571 | Werribee Secondary College Stage 2, Works order No 484-9352 | Dura (Australia) Constructions Pty. Ltd. | Adrian Cadenazzi | 115 | 24/05/2010 |
| 08-575 | Port of Melbourne South Wharf Shed Refurbishment | Loaram Constructions Pty. Ltd. | David Testolin | 224 | 31/08/2009 |
| 08-581 | Botanicca S7 - Civil Works | Hooker Cockram Projects Limited | Brendan Haynes | 220 | 21/05/2009 |
| 08-587 | Monash University Centre For Nanofabrication | Hooker Cockram Projects Limited | Brendan Haynes | 811 | 25/10/2010 |
| 08-593 | Caroline Springs College Springside Campus Stage 2 | Dura (Australia) Constructions Pty. Ltd. | Brendan Haynes | 636 | 29/01/2010 |
| 08-602 | Northern School for Autism (Preston Campus) | Shanley Management Services Pty. Ltd. | Brendan Haynes | 0 | 01/02/2009 |
| 08-999 | BER - Inner East Metro schools | Walton Construction Pty. Ltd. | Brendan Haynes | 21 | |
| 08-999 | BER - Inner East Metro schools | Mirvac Constructions (VIC) Pty. Ltd. | Brendan Haynes | 21 | |
| 08-999 | BER - Inner East Metro schools | Abigroup Contractors Pty. Ltd. | Brendan Haynes | 21 | |
| 08-999 | BER - Inner East Metro schools | Hooker Cockram Projects Limited | Brendan Haynes | 21 | |
| 08-999 | BER - Inner East Metro schools | Hansen Yuncken Pty. Ltd. | Brendan Haynes | 21 | |
| 09-002 | Road Improvememt works to Jarlo Drive - Lilydale | Swinburne University Of Technology | David Testolin | 96 | 24/07/2009 |
| 09-025 | Box Hill Conduits | Nuvo. | Simon Cock | 123 | |
| 09-026 | Tivendale Rd, Officer | Minaret Collage | Simon Cock | 3 | |
| 09-027 | Northern Hospital - SSU Stage 2 | John Holland Pty. Ltd. | Luke Jordin | 7 | |
| 09-033 | Swale Drain Diversion | Smith Madden | Grant Coulthard | 11 | 26/03/2009 |
| 09-051 | Proposed New Dental & Medical Centre | Kane Constructions Pty. Ltd. | Simon Cock | 270 | 01/05/2009 |
| 09-060 | Grand Prix | Kane Constructions Pty. Ltd. | Brendan Haynes | 18 | 30/06/2009 |
| 09-087 | Kooweerup Hospital | Kane Constructions Pty. Ltd. | David Testolin | | |
| 09-108 | Structural Safety of Suspended Olympic Rings | George E Apted and Associates Pty. Ltd. | Grant Coulthard | 3 | 14/05/2009 |
| 09-146 | RMIT Building 1 - PAH Contaminated Materials Removal | Kane Constructions Pty. Ltd. | Brendan Haynes | 391 | |
| 09-159 | Sunshine Hospital Redevelopment Stage 2 - TTR Project | Fleet Plant Hire Pty. Ltd. | Brendan Haynes | 1627 | 25/11/2009 |
| 09-159 | Sunshine Hospital Redevelopment Stage 2 - TTR Project | Western Health | Brendan Haynes | 1627 | 25/11/2009 |
| 09-159 | Sunshine Hospital Redevelopment Stage 2 - TTR Project | Western Health Care Of Hooker Cockram | Brendan Haynes | 1627 | 25/11/2009 |
| 09-159 | Sunshine Hospital Redevelopment Stage 2 - TTR Project | Meridian Concrete Pty. Ltd. | Brendan Haynes | 1627 | 25/11/2009 |
| 09-160 | Murray Rd/Albert St , Preston Intersection Modification Works | Colonial First State Property Management | Asoka Chandrawanka | 836 | 30/07/2010 |
| 09-170 | 222 Domain Road | Asian Pacific Building Corporation | Asoka Chandrawanka | 44 | 31/07/2009 |
| 09-191 | Bendigo Regional Institute of TAFE Trade Centre - Copied from Job Number 09-191e | Walton Construction Pty. Ltd. | Brendan Haynes | 753 | 20/10/2010 |
| 09-360 | Kingston CPK - Exit Road widening at Warrigal Road | Walton Construction Pty. Ltd. | Asoka Chandrawanka | 150 | 17/09/2009 |
| 09-376 | ELF Pukapunyal Stage 1 (SOARTY & SOARM) | Watters Electrical (Aust) Pty. Ltd. | Asoka Chandrawanka | 3343 | 20/07/2011 |
| 09-376 | ELF Pukapunyal Stage 1 (SOARTY & SOARM) | Kane Constructions Pty. Ltd. | Asoka Chandrawanka | 3343 | 20/07/2011 |
| 09-431 | BER Catholic Primary School (Revised 15-09-09) | Built VIC Pty. Ltd. | David Testolin | 112 | 04/06/2010 |
| 09-433 | Kingston Reserve Soccer Facility | City of Kingston | David Testolin | 2294 | 20/11/2009 |
| 09-480 | Northern Hospital Maternity Unit (MU) | John Holland Pty. Ltd. | Grant Coulthard | | |
| 09-484 | Schools - C.E | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 0 | |
| 09-504 | Avondale Community Centre (Budget Price) - Copied from Job Number 09-504A | Ireland Brown Construction Pty. Ltd. | David Testolin | 274 | 30/08/2010 |
| 09-512 | Westfield Doncaster Redevelopment - Carpark Signage Changes | Westfield Design & Construction Pty. Ltd. | David Testolin | 188 | 26/03/2010 |
| 09-544 | BER - Northern Schools Research Primary | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 45 | 15/03/2010 |
| 09-550 | SLPA - Substation Roadworks | Sugerloaf Pipeline Alliance | Asoka Chandrawanka | 464 | 15/04/2010 |
| 09-573 | Pascoe Vale North Primarry School - Concrete Footpath | Allmore Constructions Pty. Ltd. | Brendan Haynes | 69 | 30/10/2009 |
| 09-590 | Sunbury Day Hospital | ADJ Contracting Pty. Ltd. | Brendan Haynes | 1164 | 02/12/2010 |
| 09-590 | Sunbury Day Hospital | Western Health Care Of Hooker Cockram | Brendan Haynes | 1164 | 02/12/2010 |
| 09-592 | BER - Northern Schools Lalor Primary | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 3 | 15/10/2009 |
| 09-593 | BER - Northern Schools Norris Bank Primary | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 59 | |
| 09-595 | BER - Northern Schools Meadowglen Primary | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 31 | |
| 09-597 | Vision Australia | Built VIC Pty. Ltd. | Simon Cock | 104 | 01/12/2009 |
| 09-598 | BER - Southern Metropolitan & Western Metropolitan Regions - Inner West | Hooker Cockram Projects Limited | Brendan Haynes | 587 | 31/03/2010 |
| 09-599 | BER - Southern Metropolitan & Western Metropolitan Regions - Outer West | Hooker Cockram Projects Limited | Adrian Cadenazzi | 110 | 12/11/2009 |
| 09-601 | BER - Northern Schools Bundoora Primary School | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 6 | 30/09/2009 |
| 09-602 | BER - Northern Schools Banyule Primary School | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 19 | |
| 09-603 | BER - Northern Schools Diamond Creek | Construction Engineering (Aust) Pty. Ltd. | David Testolin | 82 | |
| 09-611 | Kingston CPK Service Culverts | Walton Construction Pty. Ltd. | Asoka Chandrawanka | 314 | 31/01/2011 |
| 09-614 | 6-8 Carrington Road, Balwyn North | Abd Group Pty. Ltd. | Brendan Haynes | 50 | 10/03/2010 |
| 09-624 | RFT No.PRN1727 National Towers Program, New Towers Project Melbourne Early Works Package | Hansen Yuncken Pty. Ltd. | Raid Misconi | 580 | 26/02/2010 |
| 09-633 | Lilydale Airfield | Mead Engineering Pty. Ltd. | Simon Cock | 6 | |
| 09-636 | BER - South East Primary Schools | Daisy'S Garden Supplies Pty Ltd | David Testolin | 801 | |
| 09-636 | BER - South East Primary Schools | Hooker Cockram Projects Limited | David Testolin | 801 | |
| 09-648 | Emmaus Primary Sydenham - Civil Works | Walton Construction Pty. Ltd. | Tony Barker | 39 | 26/08/2010 |
| 09-653 | Forest St Bendigo | Masbuild (Aust) Pty. Ltd. | Brendan Haynes | 64 | 30/11/2009 |
| 09-675 | Westfield Doncaster - Linemarking | Westfield Design & Construction Pty. Ltd. | Aleks Malesevic | | 21/09/2009 |
| 09-678 | Derrimut Village Shopping Centre - External Roads (Revised) | Noordenne Constructions Pty. Ltd. | David Testolin | 605 | |
| 09-679 | Derrimut Village Shopping Centre - Internal Works | Noordenne Constructions Pty. Ltd. | David Testolin | 938 | |
| 09-700 | National Ice Sports Centre - Civil and Landscaping package | Hansen Yuncken Pty. Ltd. | Luke Jordin | 418 | 28/02/2010 |
| 09-700 | National Ice Sports Centre - Civil and Landscaping package | Icehouse Melbourne Pty. Ltd. | Luke Jordin | 418 | 28/02/2010 |
| 09-734 | BAE Systems Williamstown Facilities Upgrade | Hansen Yuncken Pty. Ltd. | Brendan Haynes | 2751 | 31/01/2011 |
| 09-734 | BAE Systems Williamstown Facilities Upgrade | Bae Systems | Brendan Haynes | 2751 | 31/01/2011 |
| 09-734 | BAE Systems Williamstown Facilities Upgrade | Norstar Steel Recyclers | Brendan Haynes | 2751 | 31/01/2011 |
| 09-789 | BER - Southern Metro Region 7 | Bovis Lend Lease Pty. Ltd. | Steven Papa | 2884 | 30/11/2011 |
| 09-801 | Monash Uni - New Horizons Centre | Monaco Hickey Pty. Ltd. | David Testolin | 417 | 03/12/2010 |
| 09-820 | BER - Northern Metro Region Craigieburn South | Walton Construction Pty. Ltd. | Aleks Malesevic | 83 | 18/05/2011 |
| 09-826 | Westmeadows Primary School | Shanley Management Services | Adrian Cadenazzi | 74 | 28/02/2010 |
| 09-833 | Melbourne Rudolf Steiner School (MRSS) - Carpark | Melbourne Rudolf Steiner School | Brendan Haynes | 79 | 31/03/2010 |
| 09-838 | BER - East Metro Region | Mt Waverley Primary School | Brendan Haynes | 3026 | |
| 09-838 | BER - East Metro Region | Tinternvale Primary School | Brendan Haynes | 3026 | |
| 09-838 | BER - East Metro Region | Billanook Primary School | Brendan Haynes | 3026 | |
| 09-838 | BER - East Metro Region | Hansen Yuncken Pty. Ltd. | Brendan Haynes | 3026 | |
| 09-838 | BER - East Metro Region | Hughesdale Primary School | Brendan Haynes | 3026 | |
| 09-840 | Westfield Signage & Linemarking | Westfield Design & Construction Pty. Ltd. | Aleks Malesevic | 12 | |
| 09-859 | Kororoit Creek Primary School | Ace Landscape Services Pty. Ltd. | Simon Cock | 2578 | 28/02/2011 |
| 09-859 | Kororoit Creek Primary School | Abigroup Contractors Pty. Ltd. | Simon Cock | 2578 | 28/02/2011 |
| 09-875 | New Royal Melbourne Childrens Hospital | Bovis Lend Lease Pty. Ltd. | David Testolin | 1434 | 31/03/2011 |
| 09-878 | Craigieburn Secondary College - Science & Language Centre- REVISION to 09-878 - Copied from Job Number 09-878A - Copied from Job Number 09-878B | Craigieburn Secondary College | Raid Misconi | 146 | 10/08/2011 |
| 09-878 | Craigieburn Secondary College - Science & Language Centre- REVISION to 09-878 - Copied from Job Number 09-878A - Copied from Job Number 09-878B | Walton Construction Pty. Ltd. | Raid Misconi | 146 | 10/08/2011 |
| 09-960 | Lyndhurst Primary School | O'Donnell Griffin Pty. Ltd. | Simon Cock | 893 | 31/12/2010 |
| 09-960 | Lyndhurst Primary School | Complete Plumbing Contracting | Simon Cock | 893 | 31/12/2010 |
| 09-960 | Lyndhurst Primary School | Abigroup Contractors Pty. Ltd. | Simon Cock | 893 | 31/12/2010 |
| 09-987 | New Admin building for Melbourne water ETP (Revision B) | Built VIC Pty. Ltd. | Raid Misconi | 634 | 13/01/2011 |
| 09-987B | New Admin building for Melbourne water ETP (Revision B) | Built VIC Pty. Ltd. | Raid Misconi | | |
| 09-989 | Temporary footpath Flemington Rd | Bovis Lend Lease Pty. Ltd. | David Testolin | 59 | 31/03/2010 |
| 09-990 | Kingston Calvary Redevelopment Stage 2 | Ace Landscape Services Pty. Ltd. | Brendan Haynes | 3013 | 30/11/2011 |
| 09-990 | Kingston Calvary Redevelopment Stage 2 | Hooker Cockram Projects Limited | Brendan Haynes | 3013 | 30/11/2011 |
| 09-990 | Kingston Calvary Redevelopment Stage 2 | O'Donnell Griffin Pty. Ltd. | Brendan Haynes | 3013 | 30/11/2011 |
| 09-999 | MAB Industry Hub - Stage 01 | Abd Group Pty. Ltd. | Brendan Haynes | 234 | |
| 10-011 | Heidelberg Health & Rehabilitation Centre | Hall Construction Group | Brendan Haynes | 153 | 30/11/2010 |
| 10-011 | Heidelberg Health & Rehabilitation Centre | Kane Constructions Pty. Ltd. | Brendan Haynes | 153 | 30/11/2010 |
| 10-030 | Construction of Bus Stop 532A Keylana | Department Of Transport | Raid Misconi | 228 | 11/07/2011 |
| 10-053 | Gowanbrae Retirement Village Apartments | Buxton Construction Pty. Ltd. | Raid Misconi | 178 | 30/10/2011 |
| 10-067 | BER - Primary Schools, Northern Regional. | Walton Construction Pty. Ltd. | Luke Biltris | 425 | 31/07/2011 |
| 10-078 | BER Schools - Region 2 Package 40 | Lend Lease Project Management & Construction (Australia) | Steven Papa | 64 | 30/09/2011 |
| 10-078 | BER Schools - Region 2 Package 40 | Bovis Lend Lease Pty. Ltd. | Steven Papa | 64 | 30/09/2011 |
| 10-101 | Taylors Lakes Shopping Centre - Purchase Order 00041871 | Noordenne Constructions Pty. Ltd. | David Testolin | 534 | |
| 10-112 | Grand Prix | Kane Constructions Pty. Ltd. | Adrian Cadenazzi | 14 | 31/03/2010 |
| 10-130 | SMR Package 44,Template J&K (12 Schools with 6 Extra new schools) | Abigroup Contractors Pty. Ltd. | David Testolin | 499 | 30/04/2011 |
| 10-160 | C.S. Square & Central Shopping Centre Crossing | Lend Lease Property Management | David Testolin | 20 | |
| 10-160 | C.S. Square & Central Shopping Centre Crossing | Lend Lease Real Estate Investments Ltd. | David Testolin | 20 | |
| 10-199 | Ivanhoe Grammer (Hire Work + Contract Works) | Kane Constructions Pty. Ltd. | David Testolin | 152 | |
| 10-204 | Sunshine Hospital Redevelopment Stage 2 | Electrical.Com | Brendan Haynes | 3031 | 11/06/2011 |
| 10-204 | Sunshine Hospital Redevelopment Stage 2 | Entire Mechanical Services Pty. Ltd. | Brendan Haynes | 3031 | 11/06/2011 |
| 10-204 | Sunshine Hospital Redevelopment Stage 2 | Cockram Construction Ltd. | Brendan Haynes | 3031 | 11/06/2011 |
| 10-204 | Sunshine Hospital Redevelopment Stage 2 | Western Health Care Of Hooker Cockram | Brendan Haynes | 3031 | 11/06/2011 |
| 10-217 | Mixed use Development,Buckingham Ave,Springvale - External Works | Kane Constructions Pty. Ltd. | Asoka Chandrawanka | 601 | 31/08/2011 |
| 10-236 | Ingham's Somerville | EIMCO Water Technologies | David Testolin | 1609 | 30/09/2011 |
| 10-236 | Ingham's Somerville | Badge Constructions Pty. Ltd. | David Testolin | 1609 | 30/09/2011 |
| 10-252 | Monash University Stage 2 Museum of Art (MUMA) | Walton Construction Pty. Ltd. | Asoka Chandrawanka | 473 | 31/10/2010 |
| 10-364 | Derrimut Village Shopping Centre - Medical Centre Car Park Extension | Noordenne Constructions Pty. Ltd. | David Testolin | 176 | 01/01/2011 |
| 10-366 | Gippsland TAFE Redevelopment Chadstone - Site Works | BRD Industries Pty. Ltd. | Mark Webb | 1184 | 30/03/2012 |
| 10-366 | Gippsland TAFE Redevelopment Chadstone - Site Works | Adco Constructions (Vic) Pty Limited | Mark Webb | 1184 | 30/03/2012 |
| 10-423 | Synchrotron IMBL (Revised) | Abigroup Contractors Pty. Ltd. | Grant Bugler | 1184 | 01/01/2011 |
| 10-425 | Sandown Pit Apron Extension | Melbourne Racing Club | Darrin Hoddinott | 532 | 11/10/2010 |
| 10-428 | Project Oxygen Braybrook - External Works | Robert Luxmoore | Asoka Chandrawanka | 910 | 31/07/2011 |
| 10-439 | Westfield - Airport West (Scope Revision 1.1 28.10.2010) - Copied from Job Number 10-439b | Westfield Design & Construction Pty. Ltd. | David Testolin | 257 | 30/04/2011 |
| 10-468 | Fitzroy North Primary School - Structure Fill | Isis Projects Pty. Ltd. | Raid Misconi | 40 | 28/07/2010 |
| 10-474 | Civil Works - Melbourne Tower Project | Hansen Yuncken Pty. Ltd. | Ronan Burke | 191 | 31/12/2011 |
| 10-476 | Noble Park "More Than Just a Pool" merged with 10-476A | Kane Constructions Pty. Ltd. | Russell Moore | 1831 | 15/12/2011 |
| 10-478 | Surf Coast Civic Offices & Recreational Facility - Torquay | Hooker Cockram P.L Western Victoria | Brendan Haynes | 4602 | 15/12/2011 |
| 10-478 | Surf Coast Civic Offices & Recreational Facility - Torquay | Cockram Construction Ltd. | Brendan Haynes | 4602 | 15/12/2011 |
| 10-482 | Bridgehaven Shopping Centre - Craigieburn | Hansen Yuncken Pty. Ltd. | Russell Moore | 2439 | 30/11/2011 |
| 10-484 | VASEY RSL CARE - Aged care facility - Civil Works | Walton Construction Pty. Ltd. | Asoka Chandrawanka | | |
| 10-510 | Sunshine Hospital Redevelopment- In Patient Building | Kane Constructions Pty. Ltd. | Ronan Burke | 370 | 16/03/2012 |
| 10-529 | State Coronial Services Centre Redevelopment Rev. 2 - 2011.02.25 - Copied from Job Number 10-529C | John Holland Pty. Ltd. | Chris Ferguson | 348 | 28/11/2012 |
| 10-535 | Monash University Activity and Wellbeing Centre- Peninsula Campus | Walton Construction Pty. Ltd. | Steven Papa | 142 | |
| 10-540 | Tyremax | Wilkore Pty. Ltd. | Brendan Haynes | 264 | 31/03/2011 |
| 10-582 | WEHI Redevelopement | Baulderstone Pty. Ltd. | Brendan Haynes | 162 | 31/01/2011 |
| 10-585 | CSL Limited - Cell Culture Facility | ADJ Contracting Pty. Ltd. | Steven Papa | 804 | 31/03/2012 |
| 10-585 | CSL Limited - Cell Culture Facility | Hooker Cockram Projects Limited | Steven Papa | 804 | 31/03/2012 |
| 10-590 | Knox Private Hospital - Piles for Link Bridge | Kane Constructions Pty. Ltd. | Chris Ferguson | 34 | 31/03/2011 |
| 10-606 | Grand Prix - V8 Pit Lane Civil Works | Kane Constructions Pty. Ltd. | Grant Bugler | 733 | 28/02/2011 |
| 10-612 | Knox Private Hospital - Pavement and Kerb Works | Kane Constructions Pty. Ltd. | Brendan Haynes | 49 | 31/10/2010 |
| 10-656 | Project Oxygen Coolaroo - Ext. Works | Robert Luxmoore | Asoka Chandrawanka | 1105 | 31/10/2011 |
| 10-660 | Victoria University - St. Albans Sport Recreation & Health Facility (Revised) | Isis Projects Pty. Ltd. | Paul Cox | 280 | 31/03/2012 |
| 10-671 | Highpoint North East Precinct Redevelopment | Highbury Plumbing | Paul Cox | 4840 | 22/12/2011 |
| 10-671 | Highpoint North East Precinct Redevelopment | Caelli | Paul Cox | 4840 | 22/12/2011 |
| 10-671 | Highpoint North East Precinct Redevelopment | Probuild Constructions (Aust) Pty. Ltd. | Paul Cox | 4840 | 22/12/2011 |
| 10-671 | Highpoint North East Precinct Redevelopment | Mgr Industries Pty Ltd | Paul Cox | 4840 | 22/12/2011 |
| 10-672 | Bon-Bon station Dozer | Bush Heritage Australia | David Testolin | 9 | 30/05/2011 |
| 10-684 | Westfield Fountain Gate Redevelopment - Civil Works | Westfield Design & Construction Pty. Ltd. | Ron Cooper | 8469 | 31/12/2012 |
| 10-684 | Westfield Fountain Gate Redevelopment - Civil Works | Westfield- Early Works | Ron Cooper | 8469 | 31/12/2012 |
| 10-692 | House Cut - Keilor East - Noordenne | Noordenne Constructions Pty. Ltd. | David Testolin | 16 | 30/06/2011 |
| 10-702 | Miscellaneous Works | Walton Construction Pty. Ltd. | Tony Barker | 46 | 30/04/2011 |
| 10-702 | Miscellaneous Works | Earthmovers Australia Pty. Ltd. | Tony Barker | 46 | 30/04/2011 |
| 10-740 | Atherton Gardens, Brunswick Street, Fitzroy | Abigroup Contractors Pty. Ltd. | Ron Cooper | 602 | 31/03/2012 |
| 10-740 | Atherton Gardens, Brunswick Street, Fitzroy | Norstar Steel Recyclers | Ron Cooper | 602 | 31/03/2012 |
| 10-750 | Evelyn Ridge Retirement Village | Bovis Lend Lease Pty. Ltd. | Luke Jordin | 108 | 31/08/2011 |
| 10-760 | Bosch Subdivision Infrastructure | Bosch Chassis Systems Australia Pty. Ltd. | Asoka Chandrawanka | 342 | 31/07/2011 |
| 10-781 | Contract No. 8024 Safety Improvement Works from Smiths Road to Woolpack Road | Vicroads Western Region | Warren Higgs | 197 | 17/03/2011 |
| 10-869 | Moonee Ponds Loading Bay | Mirvac Real Estate Pty. Ltd. | Raid Misconi | 264 | 01/10/2011 |
| 10-869 | Moonee Ponds Loading Bay | Brown Consulting (Vic) Pty. Ltd. | Raid Misconi | 264 | 01/10/2011 |
| 10-929 | Willmott Park Primary School - Stage 2 Civil & Pavement Works | Walton Construction Pty. Ltd. | Jason White | 99 | 30/06/2011 |
| 11-013 | RACV Golf Club, Torquay - Footings | Kane Constructions Pty. Ltd. | Brendan Haynes | 1120 | 30/06/2011 |
| 11-021 | Harbour Town Level 1 Access Works | Hansen Yuncken Pty. Ltd. | Grant Bugler | 480 | 22/09/2011 |
| 11-030 | Kew Recreation Centre | Boroondara City Council | Brendan Haynes | 147 | 30/06/2011 |
| 11-030 | Kew Recreation Centre | Adco Constructions (Vic) Pty Limited | Brendan Haynes | 147 | 30/06/2011 |
| 11-054 | POLARIS 3083 SUBDIVISION - Internal civil works | Hacer Group Pty. Ltd. | Steven Papa | 553 | |
| 11-055 | Canterbury Apartments - Early Works | St Hilliers Contracting Pty. Ltd. | Ron Cooper | 75 | 30/06/2011 |
| 11-062 | Victoria University, Sunshine merged with 11-062f | Kane Constructions Pty. Ltd. | Ronan Burke | 1678 | 31/05/2012 |
| 11-063 | Collingwood Leisure Centre Re-development | Walton Construction Pty. Ltd. | Ron Cooper | 102 | 30/06/2011 |
| 11-101 | St Leonards Carpark & Landscape Works | St Leonards College
C/O Johnstaff Projects Pty. Ltd. | Asoka Chandrawanka | 751 | 31/08/2011 |
| 11-101 | St Leonards Carpark & Landscape Works | Johnstaff Projects | Asoka Chandrawanka | 751 | 31/08/2011 |
| 11-111 | 234 Queensberry Street, Carlton | Probuild Constructions (Aust) Pty. Ltd. | Chris Ferguson | 24 | 31/07/2011 |
| 11-120 | Prahran Housing Estate Development at Corner Malvern and Surrey Roads -Early works | Kane Constructions Pty. Ltd. | Ron Cooper | 1552 | 23/12/2011 |
| 11-134 | Proposed Performing Arts Centre, Oxley College - External Works | Johns Lyng Commercial Builders Pty. Ltd. | Raid Misconi | 72 | 31/05/2011 |
| 11-185 | Church of Jesus Christ LDS - Wantirna | Kane Constructions Pty. Ltd. | Ron Cooper | 86 | 31/12/2011 |
| 11-209 | Camberwell Library and Office | Abigroup Contractors Pty. Ltd. | Ron Cooper | 550 | 30/06/2012 |
| 11-233 | North Richmond Community Health Centre | Kane Constructions Pty. Ltd. | Ron Cooper | 131 | 28/02/2012 |
| 11-321 | 306-310 St Kilda Road, St Kilda | Abd Group Pty. Ltd. | Chris Ferguson | 325 | |
| 11-348 | TAS - Asbestos & Earthworks | Hansen Yuncken Pty. Ltd. | Ron Cooper | 140 | 31/07/2011 |
| 11-371 | Melbourne Uni - Sump Pit construction and replacement grates | Isis Group Australia Pty. Ltd. | Chris Ferguson | 8 | 30/06/2011 |
| 11-400 | Mulgrave Country Club | Johns Lyng Commercial Builders Pty. Ltd. | Brendan Haynes | 393 | 30/09/2011 |
| 11-400 | Mulgrave Country Club | Johns Lyng Commercial Builders Pty. Ltd. | | 393 | 30/09/2011 |
| 11-446 | The Canterbury Apartments - Structural Footings | St Hilliers Contracting Pty. Ltd. | Ron Cooper | 385 | 14/11/2011 |
| 11-446 | The Canterbury Apartments - Structural Footings | St Hilliers Contracting Pty. Ltd. | | 385 | 14/11/2011 |
| 11-446 | The Canterbury Apartments - Structural Footings | Oracle Structures Pty Ltd | Ron Cooper | 385 | 14/11/2011 |
| 11-446 | The Canterbury Apartments - Structural Footings | Oracle Structures Pty Ltd | | 385 | 14/11/2011 |
| 11-543 | AFFRIC - Deakin University Early Works. PO No. 111583-001 | Hooker Cockram Projects Limited | Grant Bugler | 862 | 14/12/2011 |
| 11-580 | Tram Stop Construction - East Melbourne | Vicroads - Tram & Bus Projects | Asoka Chandrawanka | 443 | 19/01/2012 |
| 11-642 | Eastland Shopping Centre Stage 5 | Probuild Constructions (Aust) Pty. Ltd. | Paul Cox | 25 | |
| 11-797 | East Burwood Plaza Redevelopment - Internal Civil works | Construction Engineering (Aust) Pty. Ltd. | Chris Ferguson | 323 | |
| 11-829 | Wesley College Moubray Street Project | Cockram Construction Ltd. | Mark Webb | 190 | |
| 11-879 | Plenty Valley shopping centre: Carpark Access Safety Changes | Westfield Design & Construction Pty. Ltd. | Ron Cooper | 33 | |
| 11-936 | Carlton Baths Working Area- Earthworks | Built VIC Pty. Ltd. | Chris Ferguson | | |
| 12-034 | Manningham Civil Precinct 1, Doncaster - civil works | Kane Constructions Pty. Ltd. | Mark Webb | | |
| 12-088 | DOPI - Attwood | Cockram Construction Ltd. | Chris Ferguson | 8 | |