Coolamon Zone Substation

Location: Coolamon, NSW

Client: Essential Energy

Date: 2015

Supply, construct, install & commission the Coolamon Zone Substation.

The substation consisted of the following:

  • 2 x 66kV landing structure,
  • 2 x 66kV disconnector/ earth SW,
  • 2 x 66kV dead break tank circuit breaker,
  • 2 x 66/11kV, 8MVA power transformer,
  • 1 x control room and related control panel installation and termination,
  • Underground 11kV cables to the indoor switchgear