Featured Projects
Project: Point Park
Location: Yarras Edge VIC
Client: Mirvac
Contract Value: $2 million
Project Manager: Graeme Savage
Completion date: 2007

 

Point Park is Yarra's Edge's own 1 hectare environmentally sustainable parkland with rain gardens and water storage cells cleverly concealed within the design. Water tanks contribute around 40% of the total park's irrigation needs whilst rain gardens treat storm water, minimizing environmental impact: ACE constructed the entire park starting with the demolition and civil works, right through to the maintenance of the garden beds and lawn areas. Key features of this project included:

  • All drainage works including the installation of underground water storage cells
  • Preparation and construction of carpark and paved areas
  • Installation of irrigation systems
  • Construction of rain gardens
  • Installation of street furniture
  • Preparation and laying of turf
  • Planting and maintenance of garden beds