Mernda Rail Extension Upgrades

Location: South Morang, Victoria

Client: John Holland

Date:  Dec 2018 – Feb 2019

As a continuation of the Mernda Rail Extension project, Ace Infrastructure were engaged by John Holland to undertake works on  McDonalds Road as well as upgrades to the South Morang Station car park (#2).

Pedestrian crossing upgrade works on McDonalds Road consisted of:

  • demolition works
  • stormwater relocation & drainage works
  • pavement & kerb works
  • traffic signal upgrade
  • line markings

Shared user path construction works within the car park consisted of:

  • footpath removal
  • retaining wall construction
  • public lighting pole relocation
  • line markings