River Red Gum Parkland

ProjectRiver Red Gum Parkland
LocationGlenroy Vic
ClientGMCT

River Red Gum Parkland

ACE was engaged by The Greater Metropolitan Cemeteries Trust (GMCT) to undertake both the 1A and 1B Packages associated with the River Red Gum Parkland development of the greenfield site, north of the existing Northern Memorial Park.

ACE Civil was involved in the following scope of works:

Stage 1A & 1B included the construction of approximately 4,500 new monumental graves and 2,100 lawn graves, the scope included:

  • Earthworks
  • Underground stormwater drainage works
  • Concrete works, including kerb and channel, vehicle crossings, footpaths, paving
  • Construction of new roads
  • Construction of new pathways
  • Landscape decorative pavements
  • WSUD swales and ponds
  • Rock beaching
  • Landscape planting
  • Grave infrastructure construction including piling
  • Establishment and maintenance period

Stage 1A was completed in February 2018 and Stage 1B in February 2019.