| Project: | High Voltage Substation |
| Location: | Laverton VIC |
| Client: | Alex Fraser Group |
| Contract Value: | $600,000 |
| Project Manager: | Randhir Kumar |
| Completion date: | June 2009 |
As part of upgrading the crushing plant at their Laverton Site, Alex Fraser Group opted to receive High Voltage Power supply to meet the additional power requirements.
The agreement between Powercor and Alex Fraser group is for a 73A supply at 22KV via a HV overhead line off Alex Fraser Drive.
The 22KV supply is received at an indoor switchroom called Alex Fraser 22KV Switchroom, owned and operated by Alex Fraser Group located off Alex Fraser Drive. The switchroom houses the 22KV switchgear comprising Energy Retailer metering equipment.
The High Voltage System consists of 3x22KV feeders originating from the switchroom namely:
The project was delivered ahead of time, within budget and of a quality that surpassed the related power utility company’s compliance officer’s expectations