Metro Trains Melbourne (MTM) appointed ACE Infrastructure to construct the new Sunshine Signal Maintenance Depot to support a major expansion of Signal Maintenance Technician (SMT) resources. Built on the “Up” side of the existing depot, this vital rail asset sits directly adjacent to the newly commissioned Sunshine Signal Control Centre (SSCC). ACE managed the heavy civil construction, structural works, and specialised rail security infrastructure required to deliver this high-capacity, modern maintenance facility.
Project Highlight
- Constructed Sunshine Signal Maintenance Depot to support expanded regional SMT resources.
- Delivered structural concrete works for the central workshop, garage, and prefabricated offices.
- Executed heavy earthworks and excavations for building pads, carparks, and detention basins.
- Installed deep foundation bored piers to support the office buildings, light poles, and security lines.
- Managed comprehensive site drainage including civil networks, building downpipes, and a detention basin.
- Integrated an underground storage tank and a specialised interceptor tank for the vehicle wash bay.
- Laid new asphalt surfaces across the commuter carpark and surrounding facility perimeters.
- Trenched and installed underground utilities including electrical services, CCTV, water, and sewer networks.
- Erected MTM high-level security fencing equipped with automated access control gates.
- Completed specialized internal finishes including protective epoxy floor coatings within the workshop office.