The Point Wilson Waterside Infrastructure Remediation Project Works package 211C – Material Laydown and Hardstand.
ACE Civil was involved in the following scope of works:
- Strip/clear and grub and prepare subgrade for placement of engineered quarry material;
- Stockpile stripped material into compacted windrows as directed by the Contractor;
- Supply and install all culverts required at vehicle crossover locations;
- Supply, place and compact 400mm of engineered quarry material to achieve 99% modified compaction
- The Subcontractor is to inspect all materials ensuring they are “fit for purpose”
- Rehabilitation/reinstatement of hardstand area including removal and disposal of engineered quarry materials, swale and culverts once site sheds have been demobilised as directed by the Contractor.