Public Lighting Mernda Junction Extension

ProjectMernda Junction Extension
LocationMernda Vic
ClientAce Civil Services

Public Lighting Mernda Junction Extension

Street and public lighting upgrade was required as part of the Hume and Copperfield drive upgrade. Works had to be completed to Powercor, Jemena and VESI standards with existing lighting maintained until the new lighting was commissioned and operational.

Ace Infrastructure was appointed as the head contractor and Ace Electrical completed all electrical works.

Ace Electrical was involved in the following scope of works:

  • Project Management
  • Removal of existing decommissioned light poles and lanterns
  • Return decommissioned parts to relevant power distributor depot for recycling
  • Boring and coring holes for lighting installation
  • Trenching and installation of conduits to VESI standards
  • Auditing of civil installation works to VESI requirements
  • Supply and installation of new poles, brackets and lanterns
  • Supply and install all cables
  • Re-connection of existing lighting poles to new point of supply
  • Electrical audits
  • As built drawings