Civil works package including stormwater drainage, concrete works, subgrade remediation and preparation for new asphalt pavements.
ACE was involved in the following scope of works:
- Excavation by NDD means to identify and expose inground services
- Upgrades to the existing inground stormwater water system in several locations
- Milling and removal of existing airside pavements
- Subgrade remediation for new airside pavements
- Contaminated material treatment and storage
- Asphalt replacement works – base and airside
- Class E (Aircraft Spec) cast insitu concrete airside drains