Wannon Water required a treated effluent fine screen system at the Warrnambool sewage treatment plant (STP) to reduce the amount of small particle (such as inert plastic and fat balls generated in the process tank) from being discharged to the ocean outfall. The new system was installed in the existing effluent concrete channel and the extracted screenings pumped with new inground pump station to the existing sludge drying beds.
Ace Electrical was appointed as the head contractor for this design and construct contract.
Ace Electrical was involved in the following scope of works: