St Kilda Road Bike Lanes

ProjectSt Kilda Road Bike Lanes
LocationMelbourne, VIC
ClientVIDA

St Kilda Road Bike Lanes

As part of Victoria’s Big Build, ACE successfully delivered the high-profile St Kilda Road Bike Lanes Project, heavily improving safety along Melbourne’s busiest cycling corridor. The major infrastructure upgrade focused on protecting the 3,500 daily cyclists from vehicle door zones and collisions. ACE’s comprehensive scope crossed two major sections between Linlithgow Avenue and Dorcas Street, and Toorak Road West to Charnwood Road reallocating road space to build protected kerbside bicycle lanes on the outer carriageways.  The project was delivered collaboratively with MRPV under the PDA model.

The complex civil package involved constructing new concrete kerb separators, widening Shared Use Path (SUP) crossings, resurfacing bicycle lanes, and installing a signalised bicycle crossing at the intricate St Kilda Junction intersection. To accommodate the new layout, ACE removed kerb outstands, reconstructed road pavements, modified traffic signals, and reprogrammed road safety cameras. Throughout delivery, ACE managed extensive community liaison, traffic control, and landscaping, maintaining seamless access for pedestrians, cyclists, local businesses, and residents.

Project Highlights:

  • Corridor Protection: Built dedicated, protected kerbside bicycle lanes to safeguard 3,500 daily cyclists from vehicle door zones and crashes.
  • Intersection Overhaul: Installed a new signalised bicycle crossing and updated complex bike routes through the St Kilda Junction intersection.
  • Civil Upgrades: Reallocated outer carriageways removed kerb outstands, reconstructed road pavements, and widened Shared Use Path (SUP) crossings.
  • Active Traffic Control: Managed constant commuter traffic in Victoria’s busiest bike corridor using semi-permanent, reduced-speed lane configurations.
  • Heritage Preservation: Implemented a strict heritage management plan to upgrade the corridor while protecting historical bluestone kerbs and cobblestones.
  • Eco-Friendly Infrastructure: Utilised innovative ORCA kerb separators made from up to 80% recycled glass, matching the local heritage aesthetic.
  • Record Stakeholder Satisfaction: Achieved the highest Stakeholder & Communications satisfaction rating for any Major Road Projects Victoria (MRPV) project to date.