ACE was appointed as Head Contractor by Parks Victoria to undertake the vital structural refurbishment of the Dee Slip Bridge. The project successfully restored the 45-metre-long, 3.7-metre-wide pedestrian and vehicle structure to full service. By balancing modern safety standards with historical conservation, ACE prioritised heritage preservation and environmental integrity—extending the bridge’s lifespan while ensuring it remains a durable, aesthetic asset that connects the community to local green spaces.
Project Highlights:
- Appointed to successfully revitalize a critical 45-metre-long, dual-purpose pedestrian and vehicle transport link.
- Balanced modern 21st-century safety compliance with strict sustainable design principles to protect the bridge’s original character.
- Combined the strength of modern steel beams with traditional timber crossheads and barriers to secure long-term durability.
- Successfully integrated a new standalone crosshead structure without relying on existing legacy crossheads.
- Reinstated all surrounding vegetation, landforms, and construction compounds to their pristine, pre-work condition.