Quality Management
ISO 9001
Environmental Management
ISO 14001
OH&S Management
ISO 45001

Wye River Bridge replacements

ProjectWye River Bridge replacements
LocationWye River, VIC
ClientDepartment of Transport & Planning (DTP)

Wye River Bridge replacements

ACE was engaged to deliver the critical replacement of the Wye River Bridge on the Great Ocean Road. The project involves replacing the aging structure with a modern, two-lane concrete bridge structure featuring pedestrian footpath, structural retaining walls, and a timber façade designed to blend with the local coastal environment. To minimise regional disruption, ACE is executing the works across a strict two-stage sequence to maintain uninterrupted traffic flow.

Project Highlights:

  • ACE is replacing the critical Wye River Bridge with a modern, high-capacity dual-lane concrete structure
  • Engineered a sophisticated two-stage demolition and construction methodology, allowing ACE to maintain continuous two-way traffic flow and community access.
  • Integrated safe, dual-sided pedestrian footpaths and a dedicated cycling lane into the new corridor.
  • Combined heavy civil engineering with local coastal aesthetics by installing a feature timber façade and structural retaining walls.
  • Successfully delivered Stage 1 downstream works in 2024, paving the way for seamless Stage 2 upstream completion in 2025.
Translate »