ACE completed the design and construction of a streetscape area within Toyota’s Centre of Excellence – a landmark Altona site which now houses more than half of Toyota’s local workforce. The final design provides an exposed aggregate walkway with timber seating and large planter boxes.
ACE’s scope of works included:
Protecting local waterways
A stormwater drain grate was located along the length of the job site, leading directly into Kororoit Creek. The delivery team addressed this potential environmental hazard by putting multiple controls in place, including general drain protection and extra protection when cleaning and sealing pavements.
Recycled glass as design feature
The secondary exposed aggregate coloured concrete used a striking mix of blue recycled glass products as a decorative feature.